The Summit at
Drexel University
Calculations
-
Maximum live load = 150 psf
-
Typical live load = 50 psf
-
Maximum span = 27.3 ft
-
Typical span = 20 ft
-
Gross Area of building = 585,328 sf
-
Mechanical Penthouse Area = 7,560 sf
-
Concrete Dead Load = 145 psf
-
Note that the upper two floors of the structure are designed with steel rather than concrete to make more room for equipment.
-
(585,328 sf - 7,560 sf = 577,768 sf)
-
-
-
Estimation of Concrete Dead Load = 145 psf x 577,768 sf = 83,776,360 lb
-
Steel Dead Load = 490 psf
-
-
Estimation of Steel Dead Load = 490 psf x 7,560 sf = 3,704,400 lb
-
Total Dead Load = 87,480,760 lb
-
Area of roof = 41,549 sf
-
1 inch Snow Load = 5.2 sf
-
Possible Snow Load = 216,055 lb.
Estimation of Dead Load
Estimation of Live Load
-
Estimation of live load = 300 psf x 585,328 sf = 175,598,400 lb
-
Estimated multiplier takes into account the combination of residential, office, parking, and retail space.
-
-
Design Wind Speed = 90 mph
-
Design Wind Load = 20.7 psf